PROJECT QUICK LINKS

Phase One
Each project below contains a detailed
description plus a gallery of images


Ashfield Girls High School
Boys Model School
Girls Model School
Grosvenor Grammar School
Orangefield Primary & Nursery School
Glendhu Nursery
Ravenscroft Nursery

Phase Two
Below are the listings for the schools projects proposed for phase two of the partnership programme.

Edenderry Nursery School
Glenwood Primary School
Springhill Primary School
Strandtown Primary School
Taughmonagh Primary School
Victoria Park Primary School
PROJECTS

Ravenscroft Nursery School
The new nursery school was completed to a very tight timescale and opened for the start of the new term much to the joy of the new intake of kids.

Ravenscroft Nursery is a two classrooms, 52 pupil, pre-school nursery in East Belfast. The pupils only attend the school for one year and as a result the main priority for the school was reducing the level of disruption to the children’s routine. The solution was to decant the school to an alternative temporary classroom block for the full year. Once vacated the existing building was demolished and a new modern building with improved facilities, natural day lighting, breakout provision and external play spaces was introduced in its place. The building was designed to fit into the surrounding environment with minimal impact on adjacent residential buildings, whilst delivering a modern and aesthetically pleasing solution.The building was positioned within the existing site to maximise the area set aside for Grass Play areas, shrub and planted areas. The comfort of staff, students and visitors has been addressed by providing highly energy efficient heating, and lighting systems. The building is equipped with underfloor heating.

Design Process 100%
Construction Process 100%
BREEAM Rating and score Target = Very Good, Score = TBC
Basic Building Cost - £/m2 - £/m2
Services Costs - £/m2 - £/m2
External Works - £/m2 - £/m2
Gross floor area - m2 Primary 2,455m2 and Nursery 287m2
Total area of site - hectares 2.2 hectare
Function areas and their size (m2) Teaching 277m2
Area of circulation (m2) 203m2
Area of storage (m2) 165 m2
% area of grounds to be used by community (where relevant) 50%
% area of buildings to be used by community (where relevant) 80%
Predicted electricity consumption - kWh/m2 25 kWh/m2
Predicted fossil fuel consumption - kWh/m2 125 kWh/m2
Predicted renewable energy generation - kWh/m2 0.06 kWh/m2
Predicted water use - m3/person/year 4 m3/person/year
% predicted water use to be provided by rainwater or greywater Not Applicable
The steps taken during the construction process to reduce environmental impacts Site Waste Management Plans are used on all projects and we use Smart Waste as its main tool for monitoring and managing all waste management activities.
Innovative construction management techniques Strategic Partnering allowed us to form an Integrated Design Team at a very beginning of the design process. Bringing all of the key stakeholders together resulted in designs which were optimised to meet aspirations as well as provide value for money.
A list of any social or economically sustainable measures achieved/piloted. The site was registered with the Considerate Constructors scheme. As part of our commitment to social sustainability we worked closely with local residents committees to ensure that disruption due to construction activities was kept to a minimum. Our regular newsletters provided the community with updates on the progress of construction
 
 
     